Popular Resources

Watch the progress on our new building.

The new academic building is quickly changing our skyline.

The roof line is taking shape (January 16, 2012)

The view from the athletic fields and the library (January 12, 2013)

Looking good! (December 27, 2012)

We have a roof! (December 19, 2012)

Floors are in (December 6, 2012)

Pouring concrete. Hello up there! (November 27, 2012)

Just before Thanksgiving break, Dr. Conneely and students signed their names for posterity on the final support beam.